12.0210 Limit of utility responsibility.

Cite as [A.S.A.C. § 12.0210]

The primary delivery point shall be the pole or structure upon which the primary metering is installed. The utility shall have no responsibility to own, construct, operate, or maintain any facilities beyond such pole or structure.

History: Rule 4-80 eff 1 Apr 80, Primary Delivery Point.