12.0211 Trouble calls.

Cite as [A.S.A.C. § 12.0211]

The utility is responsible for maintaining electric service only up to the delivery point. The consumer should, therefore, determine that the trouble is not the building wiring or equipment before requesting service from the utility.

History: Rule 4-80, eff 1 Apr 80, Trouble Calls.