12.0226 Meter equipment issuance.

Cite as [A.S.A.C. § 12.0226]

When the electrician is ready to wire the building, he should contact the utility, which will issue the meter base and other required meter equipment at cost. At time of issuance of meter base, the location of the delivery point and the meter will be determined by the utility.

History: Rule 4-80. eff 1 Apr 80, Procedure.