Buy cheap gay porn.

25.0403.6 Compliance with Approved Engineering Drawings and Specifications

Cite as [A.S.A.C. § 25.0403.6]

All construction shall conform to approved engineering drawings and specifications. In order to make a change in an approved design that will affect water quality, capacity, flow, sanitary features, or other performance characteristic, a public water system shall submit revised engineering drawings and specifications to AS-EPA for review, together with a written statement regarding the reasons for the change. The public water system shall not proceed with the construction affected by the design change without written approval from AS-EPA. Revisions not affecting water quality, capacity, flow, sanitary features, or other performance characteristic may be permitted during construction without further approval if As-Built drawings prepared by a registered professional engineer document these changes.

History: Rule 1-08, eff 1 Jun 08.